Aquatic Center Updates
For periodic aerial footage of the construction site, visit the Springville City Vimeo page here.
April 14, 2017
- Underground pipes in locker rooms (April 13, 2017)
- Brick masons back on job site. Walls going up around mechanical/chemical room (April 13, 2017)
- South East corner, wall for guard room (April 13, 2017)
- Same guard room from another angle (April 13, 2017)
- Basement entrance into mechanical/chemical room (April 13, 2017)
- Inside mechanical room looking at swiss cheese wall (April 13, 2017)
- Another view inside chemical room (April 13, 2017
- Exterior wall of mech/chem room (April 13, 2017)
- Exterior wall of mech/chem room (April 13, 2017)
- South wall of leisure pool, fin walls being formed and will be poured today. In between the fin walls will be glass doors that lead from leisure pool to outside sundeck (April 13, 2017)
- This is the wall between leisure pool and chem/mech room. (April 13, 2017)
April 7, 2017
- North East corner, maintenance and storage room
- Crane arrived today, brick masons start Area 2 Monday!
- Wall between comp pool and locker rooms, footing done and foundation next week
- East Wall of comp pool, footing done and foundation next week
- Underground electrical being placed before floor is poured
- Underground electrical being placed before floor is poured
- Mechanical Room floor is poured
- South East corner of building, 1 cement column is done, 5 more being poured today
- South East corner
- South East corner
- Basement entrance to mechanical room
March 31, 2017
- Looking into competition pool from the hallway
- Changing rooms have been backfilled and footings are getting formed
- Footings getting formed on East wall of the competition pool
- Footings for the East side of building have been poured, foundation next week
- Now that the main lines for competition pool have been installed, they are backfilling the leisure pool area
- Plumbers digging floor drains in Mechanical Room
- Standing in the locker rooms looking East as they form the footings for the south wall of competition pool
- Lid of the surge tanks, cement next week
- Mechanical room
- Leisure Pool
- Leisure Pool
- Leisure Pool
March 22, 2017
- South East wall footings, poured Monday
- Standing in the chemical room, it has been backfilled and getting ready to pour next week after plumbers have set all pipes
- Another view of chemical room floor
- Underground pipes
- Underground pipes
- Underground pipes
- Backfilling for locker rooms
- Backfilling for locker rooms
- East wall footings
- East wall footings
- Pipes between swiss cheese wall and surge tank
March 17, 2017
The blocks that they gym bleachers will be installed on have been installed. Walls are going up and the cement for floors is being poured. Things are moving forward at a great pace.
- Pre-cast bleacher will sit on these blocks
- Gym bleacher blocks
- Looking west, masons are working on the west wall of the competition pool.
- Foundation was poured last week of wall that separates changing rooms and leisure pool
- Foundation of East wall, pour was Thursday
- Waterproofing wall before back fill.
- Water lines of the competition pool that will lead back to the mechanical room
- Chemical/mechanical room
- Looking from 1200 West at the wall the masons are working on
- Outside entrance to mechanical room
- Another view of the swiss cheese wall.
- This poor will happen Monday
March 9, 2017
With multiple trades working there were 50+ employees on the site per day. The gym floor was completely poured yesterday along with some other footings. There is another pour today at 2 pm and 1 pm tomorrow. A total of 240 yards of concrete were poured this week.
In about two weeks, all footings will be poured. One week later all foundation will be complete (except where they are leaving an opening to get big equipment in and out of the facility to work). Veneer will be complete on the gym next week. The mason will start putting block up in Area 2 (pools) on April 3.
- The exterior air barrier and block veneer starting to go up
- View of air barrier and veneer
- Air barrier and veneer
- Gym floor concrete complete
- Gym floor
- Out side gym wall
- South East Corner where the water slides will be
- This is what is being called the “swiss cheese wall”. It’s where all the water lines go in and out of the chemical room
- Forms being stripped off the concrete from a chemical room pour
- Another view from the side where the forms have been removed.
February 17. 2017
The walls have been going up quickly. Things are starting to take shape. Footings for other walls have been formed and those walls should be going up soon as well.
- Looking South East, walls are going up.
- North East corner of the building. Walls are 13′ tall
- North wall of gym
- Inside the gym
- Inside the gym
- Interior wall between gym and competition pool
- Footings getting formed on West Wall
- South Wall Footings
- Footings were poured this week for the West Wall
- Formed footings of West wall looking south poured
- Storage room for competition pool located between the comptetion pool and gym
- West wall of the gym
- North West corner of building
- Another photo of the North West corner
February 9, 2017
The crane arrived this week, was mobilized and it is being used to help the brick mason to start building the walls.
- This is where the competition pool will be.
- Picture of the surge tank and mechanical/chemical room from groundlevel
- Picture of the surge tank and the mechanical/chemical room, it is backfilled from last week
- West wall footings of the competition pool.
- This was poured today, wall between gym and competition pool
- The soon to be gym
- Large footing for the wall and storage between competition pool and gym
- Work getting started on the west wall
- The crane working to get bricks to the mason
- South Wall footings
- North Wall
- Northwest corner of the building
- North wall
- North wall, scaffolding is up and brick is being laid
- North east corner, footing done
- The crane at the site
February 2, 2017
Footings have all been poured and the foundations wall is half done. The Mason should be able to start going vertical with the walls beginning in the Northwest corner of the building next week. Work has also been done on the water main vault, chemical room, interior wall footings and other parts of the building.
- Footings all poured and foundation wall is half done
- South wall of gym that separates the competition pool, pouring today
- East wall of gymnasium
- This is looking North West, this is the entrance into gymnasium
- Competition Pool
- Outside chemical room
- Main water supply outside of vault
- Main water supply for the pools
- Backfilling so they can get footings formed for the walls of chemical room
- Forming footings for wall between gym and comp pool, pouring today
- Foundation walls poured on West wall
- Northwest corner of building, foundation pour. Mason will start here with block walls next week.
January 24, 2017
Footings and foundations are being poured on the West side working towards North corner and continuing East. Once they get the foundations in the Mason will be onsite to start going vertical with walls.
- West wall footings that were poured last week
- North wall footings that got poured yesterday
- Forming the foundation on North East corner of building that will get poured tomorrow
- Track hoe is in the deep end of competition pool